STANDARD

Performance Contract

30%

of verified utility savings only

✓ No upfront cost
✓ No hardware purchase
✓ IPMVP Option B M&V
✓ You keep 70% of savings
✓ Continuous monitoring
✓ All three savings layers
Get Started

Example: 500-Node California Datacenter

At $0.27/kWh California commercial rate:

Annual baseline energy cost$827K/yr
Layer 1 savings (89% idle)$370K/yr
Layer 2 savings (87% inference)$360K/yr
Total facility savings (79%+)$654K/yr
Your share (70% of utility savings)$458K/yr
GTC fee (30% of utility savings)$196K/yr

Savings at Scale — California Rate ($0.27/kWh)

Facility SizeAnnual BaselineLayer 1 (89%)Layer 2 (87%)Total (79%+)Your Share (70%)
100 nodes$166K$74K$72K$131K$92K/yr
500 nodes$828K$368K$360K$654K$458K/yr
1,000 nodes$1.66M$737K$720K$1.31M$916K/yr
5,000 nodes$8.28M$3.68M$3.60M$6.54M$4.58M/yr

Calculations based on enterprise GPU facility baseline assumptions (H200 GPU, 1,000W/node, $0.27/kWh CA rate). Actual results vary by workload mix, GPU/CPU type, utilization rate, PUE, cache-hit rate, and measurement period. All savings independently measured and verified under IPMVP Option B (the International Performance Measurement and Verification Protocol — the government-recognized standard for confirming energy savings are real).

30-Day Trial. Your Infrastructure. Your Data.

If you're not confident the savings are real, we'll prove it on your own nodes under IPMVP Option B measurement. See the results with your own telemetry before you commit to anything. No upfront cost. No obligation.

Start Your 30-Day Trial